Horton Construction, MobyDick Quick 939 G

Location: Construction Site
Project
: Waste Landfill

Problem Area

  • 5 year project
  • Heavy track out
  • 1000 daily truck movement
System designed to wash over 1000 tractors with dual bottom dump trailers per day.

 

Generator power, closed loop concrete drive down recycling tank and solids separation tank.
  • Drive Through unit
  • 3-Tire revolution
  • 6 Pump - 2850 GPM
  • 30,000 gallon drive down
  • Solid separation and water recycling pit
  • MobyDos flocculent system
High Volume and Low Pressure